Sign Out
View Profile
Company Name
Name
Email Id
User ID / Mobile Number
Address
Location
Pin Code
iSMC
Paymaa logo display here
    Last Login :
  • HOME
  • MMR One View
  • One View
  • One View
  • One View
  • MMR Dashboard
  • MMR Dashboard
  • MMR Dashboard
  • OneView Dashboard
  • OneView Dashboard
  • OneView Dashboard
  • Dashboard
    • GateCheck Dashboard
    • MEP/HK Check Dashboard
    • Inventory Dashboard
    • HelpDesk Dashboard
    • Inventory Check Dashboard
    • Feedback Check Dashboard
    • SmartServices Dashboard
  • DMMR
  • Users Profile
  • Attendance
  • SecurityAssets Management
  • Booking Box
    • Add Amenities
    • Add Tariffs
    • Book Amenities
    • Booking History
    • CheckIn/CheckOut
    • Activities
    • Activity Payments
    • Add Cancellation Policy
    • Terms And Conditions
    • Settings
  • Approvals
    • Family Details
    • Booking
    • OutPass
  • Security GateCheck
    • Dashboard
    • GateCheck
    • Add Society Staff
    • Attendance
    • GateCheck Reports
  • Inventory
    • Dashboard
    • Items
    • Inward
    • Consumption
    • Stock
    • Low Stock
    • Stock Request
    • Approvals
    • Reports
  • Job Tracking
    • Acknowledge/InProgress Jobs
    • Schedule Jobs
  • AMC Tracking
    • Acknowledge/InProgress AMC
    • Schedule AMC
  • Complaints Tracking
  • Escalation Staff
  • Facility Team Details
  • Emergency Details
  • Settings
    • Change Password
    • Add Booking Box InCharge
    • Add Maintenance InCharge
    • Add GateCheck
    • Contact Us
  • Users Profile
  • Ground Team
  • GateCheck
    • Dashboard
    • Visitors
    • Vendors
    • Monthly Pass
    • Delivery boys
    • Transport
    • Interview Schedule
    • Reports
    • AccessCard
  • Material Tracking
  • MEP/HK Check
    • Dashboard
    • Add Assets/List
    • Asset Register
    • NFC Details
    • NFC/QR Status
    • Assets Details
    • History Card
    • Enroll Checklist
    • 52 Week Calendar
    • Checklist Status
    • Checklist Reports
    • Checklist Settings
    • Checklist Download
    • Checklist Template
    • Checklist Deactive
    • Checklist Deactive List
    • Observations/Alerts
  • Asset Register 2.0
    • Dashboard
    • Assets
    • Approvals
    • Settings
    • Hierarchy
  • AMC
  • Work Permit
  • Work Permit
  • Work Permit
  • Work Permit
  • Work Permit
  • Work Permit
  • Work Permit
  • WorkPermit
  • Incident Check
  • Audit Checklist
  • IMPOF TEAMS
    • Approval
    • Sales Funnel
    • Won/Lost
    • Contacts
    • ActivityCheck
    • DMR
    • Calendar
    • WorkOrder
    • Invoice
    • PettyCash
    • PO Expired
    • Hierarchy
    • Tracker
    • Reports
    • Settings
  • Booking Box
    • Add Amenities
    • Add Tariffs
    • Book Amenities
    • Booking History
    • CheckIn/CheckOut
    • Activities
    • Activity Payments
    • Add Cancellation Policy
    • Terms And Conditions
    • Settings
  • Inventory
    • Dashboard
    • Items
    • Inward
    • Stock
    • Low Stock
    • Stock Request
    • Approvals
    • Reports
  • Inventory Check
    • Dashboard
    • E-Store
    • Inward
    • Stock
    • Low Stock
    • Stock Request
    • Purchase Request
    • Reports
  • Cafeteria Check
  • HelpDesk
    • Dashboard
    • Open
    • In Progress
    • Hold
    • Closed
    • Completed
    • Reports
    • Settings
    • Documents
  • Raise a Ticket
  • Helpdesk
  • Feedback Check
  • Survey Check
  • Incident Check
  • Incident Check
  • Incident Check
  • Incident Check
  • Incident Check
  • Incident Check New
  • Service Checklist
  • Compliance Check
  • Vendor
  • Utility Check
  • Consumption
  • HOTO Sheet
  • HOTO Sheet
  • Monthly MIS
    • Training Schedule
    • Maintenance Schedule
    • EhsMatrics
    • MachineBreakDown
    • ToolsAuditReport
    • AmazeSla
    • GtsSla
    • SecuritySla
    • Reports
  • Accounting
    • Invoice Check
    • WorkOrder Check
    • Petty Cash
    • Petty Cash New
    • EB Billing
    • RFQ
  • Parking Check
  • Space Management
    • Dashboard
    • Users
    • Client
    • Invoice
    • Approval
    • Seats
    • Cabin
    • Amenity
    • Bookings
    • Events
    • Parking
    • Hierarchy
    • Settings
    • Reports
  • Activity Check
  • Key Check
  • Mailroom Check
  • Roaster Check
  • Smart Services
  • Daily Tracker
  • Transport
  • Park Plus
  • Mail Configuration
  • Documents
  • QR Download
  • Profile
  • Log Out
Profile Logout
Return to Office is IN. Hybrid or Not, Smartcheck is your path to check all compliances and come back. Let's Work Wonders at office once again.
  • Notifications
  • E-Mails


Notice

Dear Patron Owing to recent releases, you might experience short lapses in the platform between 11pm to 2am today. However please be assured that it will resume in a couple of minutes and you don't need to raise any tickets for the same.
Happy Upgrade!

WorkPermit Settings Hierarchies Reports

WorkPermit Check

Powered by

Raise WorkPermit

Time
(Note: Preferably all work shall be Mall Non-Operational Hours only)

Note: An adequate Risk Assessment of the activity carried out for applying the neccessary mitigation measures to minimize the potential risk.The risk level for HIRA (general) is to be declared after considering the implementation of Engineering control,Administrative control and PPE for the identified risk. A seperate detailed 'Safety Assessment' should be prepared for any major change in facility/major work.I have read and understand all the aspect of Terminal Works Procedure and undertake to brief and ensure compliance by all concern(Job executing team/supervisors)to abide by the above mentioned safety requirement.

Risk Factor
Acceptable/Not Acceptable
HIRA Prepared By(Job Initiator and Job Executer)
Name:
Date:*
Your signature will go here!

HIRA Reviewed By(Safety Department)
Name:
Date:
Your signature will go here!

BY THE RETAILER/AGENCY/COMPANY/VENDOR
Name:
Your signature will go here!

The operations department will only allow the work to happen after authorization from the security department.
Retailers Relations
Ops Manger
Manager - Loss Prevention
Sr. Marketing Manager
Finance Manager
Finance Manager
Chief Engineer
Sr. Manager Operation
General Manager
SAFETY PRECAUTIONS REQUIRED
General Do's and Don'ts
1. Safety clearance form should be pasted on work site with labor list & indemnity.
2. Duplicate key of work site should be available at mall security (Applicable for board out work site)
3. The Contractor should start work only after the site is safe for work.
4. Physical fitness is must for all workers.
5. No cooking or sleeping, No Smoking, No Spitting, No washing, is allowed in the premises as anytime.
6. No usage of any kind of alcohol, cigarettes, pan, and tobacco permitted in work area
7. No smoking signage should be displayed at work site.
8. Labour to be aware of Basic Safety, First aid, Emergency exits and Emergency Contact numbers.
Access Movement
1. No work should happen in customer area between 10am to 11pm (MOD may permit).
2. No Labor movement in customer area during trading hours.
3. No disturbance should be caused to customer.
4. Identity card to be issued by Contractor & Site Card by Inorbit Malls (Vashi).
5. Emergency numbers should be visible on work site.
6. All workers should carry / Display carries ID cards.
7. Only Mentioned workers in security clearance are allowed to work.
8. Contractors have to submit labor list with their residential address & contact Numbers of relatives.
Mandatory safety Measures
1. Safety signage should be properly displayed at all work sites.
2. Emergency light required at work site (Applicable for board out work site).
3. Safety Helmets to be worn (Mandatory for any work at 10 ft Height & Above).
4. Safety Harness to be worn (Mandatory for any work at 10ft Height & Above).
5. All ladders used for the work to be in good condition.(only aluminum ladders).
6. Required footwear to be worn while performing work in the Mall.(to be decided by nature of work ).
7. Fire extinguishers should be available at all work sites (Minimum 5Kg, DCP-Type).
8. Emergency Medical Kits to be available all work site.
9. Work site should be kept combustibles free. Proper storage closets for combustible and hazardous material should be maintained.
10. Fire exit to be kept free from obstruction.
Civil safety measures
1. A 35-foot safe zone in all directions from the welding area must be maintained by covering all combustibles with non-combustible material or removing them.
2. If any work happens at a height of 20ft or above then a security guard to be deployed.
3. Any modification to the sprinkler to be notified to MOD in advance to isolate and depressurize the system. Proper cover of the sprinklers to be fixed to the sprinkler vials.
4. Adequate ventilation to be maintained at work site.
Electrical safety measures
1. Electrical equipments should be in proper working condition.
2. Joint free electrical wire should use at work site (Connectors & Two pin are mandatory).
3. All electrical Switches lights should be placed in the proper place
4. Installation of temporary motor.
I hereby declared that read through all the above safety instructions and committed to adhere to ensure Zero Incident/Accident

Extended WorkPermit

Raise WorkPermit

Time
(Note: Preferably all work shall be Mall Non-Operational Hours only)

Note: An adequate Risk Assessment of the activity carried out for applying the neccessary mitigation measures to minimize the potential risk.The risk level for HIRA (general) is to be declared after considering the implementation of Engineering control,Administrative control and PPE for the identified risk. A seperate detailed 'Safety Assessment' should be prepared for any major change in facility/major work.I have read and understand all the aspect of Terminal Works Procedure and undertake to brief and ensure compliance by all concern(Job executing team/supervisors)to abide by the above mentioned safety requirement.

Risk Factor
Acceptable/Not Acceptable
HIRA Prepared By(Job Initiator and Job Executer)
Name:
Date:
Your signature will go here!

HIRA Reviewed By(Safety Department)
Name:
Date:
Your signature will go here!

BY THE RETAILER/AGENCY/COMPANY/VENDOR
Name:
Your signature will go here!

The operations department will only allow the work to happen after authorization from the security department.
Retailers Relations
Ops Manger
Manager - Loss Prevention
Sr. Marketing Manager
Finance Manager
Finance Manager
Chief Engineer
Sr. Manager Operation
General Manager
SAFETY PRECAUTIONS REQUIRED
General Do's and Don'ts
1. Safety clearance form should be pasted on work site with labor list & indemnity.
2. Duplicate key of work site should be available at mall security (Applicable for board out work site)
3. The Contractor should start work only after the site is safe for work.
4. Physical fitness is must for all workers.
5. No cooking or sleeping, No Smoking, No Spitting, No washing, is allowed in the premises as anytime.
6. No usage of any kind of alcohol, cigarettes, pan, and tobacco permitted in work area
7. No smoking signage should be displayed at work site.
8. Labour to be aware of Basic Safety, First aid, Emergency exits and Emergency Contact numbers.
Access Movement
1. No work should happen in customer area between 10am to 11pm (MOD may permit).
2. No Labor movement in customer area during trading hours.
3. No disturbance should be caused to customer.
4. Identity card to be issued by Contractor & Site Card by Inorbit Malls (Vashi).
5. Emergency numbers should be visible on work site.
6. All workers should carry / Display carries ID cards.
7. Only Mentioned workers in security clearance are allowed to work.
8. Contractors have to submit labor list with their residential address & contact Numbers of relatives.
Mandatory safety Measures
1. Safety signage should be properly displayed at all work sites.
2. Emergency light required at work site (Applicable for board out work site).
3. Safety Helmets to be worn (Mandatory for any work at 10 ft Height & Above).
4. Safety Harness to be worn (Mandatory for any work at 10ft Height & Above).
5. All ladders used for the work to be in good condition.(only aluminum ladders).
6. Required footwear to be worn while performing work in the Mall.(to be decided by nature of work ).
7. Fire extinguishers should be available at all work sites (Minimum 5Kg, DCP-Type).
8. Emergency Medical Kits to be available all work site.
9. Work site should be kept combustibles free. Proper storage closets for combustible and hazardous material should be maintained.
10. Fire exit to be kept free from obstruction.
Civil safety measures
1. A 35-foot safe zone in all directions from the welding area must be maintained by covering all combustibles with non-combustible material or removing them.
2. If any work happens at a height of 20ft or above then a security guard to be deployed.
3. Any modification to the sprinkler to be notified to MOD in advance to isolate and depressurize the system. Proper cover of the sprinklers to be fixed to the sprinkler vials.
4. Adequate ventilation to be maintained at work site.
Electrical safety measures
1. Electrical equipments should be in proper working condition.
2. Joint free electrical wire should use at work site (Connectors & Two pin are mandatory).
3. All electrical Switches lights should be placed in the proper place
4. Installation of temporary motor.
I hereby declared that read through all the above safety instructions and committed to adhere to ensure Zero Incident/Accident

Loading Please Wait......

WorkPermit Details

Confirm Review?
Confirm Delete?

Close WorkPermit

12 hours format